The drain for the toilet. Notice that is is not centered. There was a beam right in the middle of the floor, so I had to push the toilet to the left of the room.
What you are seeing is the water pipes and drain for the bathtub on the other side of this wall. My job was to change those tub pipes to also supply water for the sink and toilet and to run a new drain up for the sink.
And now, the same wall with the new pipes before I put the wall back on. I had to bring the hot water pipe over to the left side so it would be in the correct place.
One is really not suppose to work with bare feet - but it was so useful! I love that my foot looks normal but that my hand looks like it belongs to an alien.
The new vanity installed.
Happy sitting on the new toilet.
The new vanity installed.
Happy sitting on the new toilet.
To finish the project, I now have to put in an electric outlet, a mirror, a towel rack and toilet roll dispenser. Then, on to the next project.... Total cost of all materials for the bathroom: $617.90.